The structural design was provided for 30 villas and all other on-site facilities. These 30…
A multi-use building was designed for Polat Holding, consisting of 2 floors of shopping mall…
A technical due diligence study was conducted for four shopping malls on behalf of Atkins…
A technical due diligence study was conducted for the Neomarin shopping mall for Merrill Lynch….
The Forum Istanbul shopping mall was built on a construction area of 495,000 sqm, with…
A technical due diligence study, including design review and earthquake performance assessment, was conducted for…
A feasibility study was conducted for using seismic base isolation in a 30-story, 102-meter-high reinforced…
Geotechnical and structural design services were provided for the system selection for the dry docks….
The preparation of a feasibility study report was carried out for the 13.6 km long…