OUR PROJECTS
Çopikas Paper Factory
Çopikas Paper Factory
Engineering consultancy services were provided to determine the structural performance level for the DS Smith Çopikas Paper Production Factory. The plant consisted of various industrial units, including production facilities, heavy press machinery systems, machinery foundations, storage warehouses, a power distribution unit, and an external water treatment center. It was built on a 110,000-sqm area, with 28,000-sqm of covered buildings and structures. The plant was later acquired by the Olmuksa company.